Case Study – Confined Space Entry

May 22nd, 2020|0 Comments

Confined space entry to clear storm water lines. Client Ryan Civil Location Redbank Date May 2020 Duration 2-4 Weeks Lee’s Environmental is currently onsite cleaning out the stormwater drains at the Richard Cooks construction site

Remove Crust from Pump Station

May 14th, 2020|0 Comments

Case Study – Remove Crust from Pump Station Client Logan City Council Location Bethania Date 6th May 2020 Duration 1 day Our Intimidator combo truck and water truck work together to break up the crust

Free Printable Septic System Guide

May 14th, 2020|0 Comments

Free Printable Septic System Guide Although septic systems are a relatively simple form of waste management, they require bacteria to break down the waste that enters the tanks to ensure the waste does

Charity Drought Relief

April 10th, 2020|0 Comments

Lee’s Environmental participated in the Brisbane Irish Drought Run, travelling a 440km road trip to bring relief to those affected by drought. On the 21st December 2019, Matthew Eaton and Kirk Chant from Lee’s Environmental