Case Study – Confined Space Entry
Confined space entry to clear storm water lines. Client Ryan Civil Location Redbank Date May 2020 Duration 2-4 Weeks Lee’s Environmental is currently onsite cleaning out the stormwater drains
Confined space entry to clear storm water lines. Client Ryan Civil Location Redbank Date May 2020 Duration 2-4 Weeks
Confined space entry to clear storm water lines. Client Ryan Civil Location...
Case Study – Remove Crust from Pump Station Client Logan City Council...
Arsenic Removal Client Hi-Quality Group for Dongwha Australia’s Bombala Plant Location Bombala...
Empty and Purge Tank Farm Lee’s Environmental is one of the few...
Garden and Pebble Removal One of the little known, but very handy...
The Enforcer – Our New Combo Truck We are excited to welcome...
Pump out 2 million litres of sewage from Logan City Council Sewage...
Multiple daily pumpouts for Ausbuild of sewer manhole to prevent overflow until...
Confined space entry to clear storm water lines. Client Ryan Civil Location Redbank Date May 2020 Duration 2-4 Weeks Lee’s Environmental is currently onsite cleaning out the stormwater drains
Case Study – Remove Crust from Pump Station Client Logan City Council Location Bethania Date 6th May 2020 Duration 1 day Our Intimidator combo truck and water truck work together
Arsenic Removal Client Hi-Quality Group for Dongwha Australia’s Bombala Plant Location Bombala Plant Date Monday 9.12.19 – Friday 13.12.19 Duration 5 Days Lee’s Environmental cleaned out an old timber treatment
Empty and Purge Tank Farm Lee’s Environmental is one of the few companies available in SEQ with the capabilities to perform the complex job request we received: A tank farm
Garden and Pebble Removal One of the little known, but very handy uses for vacuum excavation is in the garden. Because of the highly sensitive controls available on our vacuum excavation trucks,
The Enforcer – Our New Combo Truck We are excited to welcome the latest addition to our fleet of trucks – The Enforcer! This purpose driven, custom built combination truck
Pump out 2 million litres of sewage from Logan City Council Sewage Treatment Plant sludge bed and clean aerator pumps for replacement. Client Logan City Council Location Logan City Date
Multiple daily pumpouts for Ausbuild of sewer manhole to prevent overflow until infrastructure is completed. Client Ausbuild Location Kinross Estate, Thornlands Date Aug 2018 – Ongoing Duration 1 Year +