Call 07 3206 4844

Case Studies

The latest articles and insights in Australian waste management.

Confined space entry to clear storm water lines. Client Ryan Civil Location Redbank Date May 2020 Duration 2-4 Weeks  

Featured Posts

Latest articles

Confined space entry to clear storm water lines. Client Ryan Civil Location...

Case Study – Remove Crust from Pump Station Client Logan City Council...

Arsenic Removal Client Hi-Quality Group for Dongwha Australia’s Bombala Plant Location Bombala...

Empty and Purge Tank Farm Lee’s Environmental is one of the few...

Garden and Pebble Removal One of the little known, but very handy...

The Enforcer – Our New Combo Truck We are excited to welcome...

Pump out 2 million litres of sewage from Logan City Council Sewage...

Multiple daily pumpouts for Ausbuild of sewer manhole to prevent overflow until...

Case Study – Confined Space Entry

Confined space entry to clear storm water lines. Client Ryan Civil Location Redbank Date May 2020 Duration 2-4 Weeks   Lee’s Environmental is currently onsite cleaning out the stormwater drains

Remove Crust from Pump Station

Case Study – Remove Crust from Pump Station Client Logan City Council Location Bethania Date 6th May 2020 Duration 1 day Our Intimidator combo truck and water truck work together

Arsenic Removal

Arsenic Removal Client Hi-Quality Group for Dongwha Australia’s Bombala Plant Location Bombala Plant Date Monday 9.12.19 – Friday 13.12.19 Duration 5 Days Lee’s Environmental cleaned out an old timber treatment

Empty and Purge Tank Farm

Empty and Purge Tank Farm Lee’s Environmental is one of the few companies available in SEQ with the capabilities to perform the complex job request we received: A tank farm

Garden and Pebble Removal

Garden and Pebble Removal One of the little known, but very handy uses for vacuum excavation is in the garden. Because of the highly sensitive controls available on our vacuum excavation trucks,

The Enforcer – Our New Combo Truck

The Enforcer – Our New Combo Truck We are excited to welcome the latest addition to our fleet of trucks – The Enforcer! This purpose driven, custom built combination truck

2019 LCC WWTP Oxidisation Ditch

Pump out 2 million litres of sewage from Logan City Council Sewage Treatment Plant sludge bed and clean aerator pumps for replacement. Client Logan City Council Location Logan City Date

Kinross Estate Sewer Line Management

Multiple daily pumpouts for Ausbuild of sewer manhole to prevent overflow until infrastructure is completed. Client Ausbuild Location Kinross Estate, Thornlands Date Aug 2018 – Ongoing Duration 1 Year +